Install
Please confirm you are human
This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.
A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.
News
CNO Visits Naval Station Mayport
3+ day, 13+ hour ago (133+ words) Chief of Naval Operations (CNO) Adm. Daryl Caudle and Master Chief Petty Officer (MCPON) of the Navy John Perryman visit Naval Station Mayport, Florida, Sept. 9, 2026. During the visit, CNO and MCPON met with leadership at U.S. Naval Forces Southern Command/U.S. 4th Fleet…...
Navy Returns 7,800-Ton Nuclear Submarine USS North Dakota to the Fleet
6+ day, 18+ hour ago (185+ words) Interesting Engineering Navy Returns 7,800-Ton Nuclear Submarine USS North Dakota to the Fleet The USS North Dakota is back in the Navy after its historic first Block III Virginia-class overhaul at Portsmouth, returning with critical maintenance and modernization work complete....
Pearl Harbor Naval Shipyard wraps up dry dock phase of North Carolina Maintenance
1+ week, 4+ day ago (259+ words) From left, Kanoho Tripp, rigger helper, Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF), and Micah Fernandez, rigger work leader, PHNSY & IMF, handle a control line during the Virginia-class fast-attack submarine USS North Carolina (SSN 777) undocking from Dry…...
Naval Station Norfolk returns to normal operations
1+ week, 4+ day ago (36+ words) Hours after putting precautionary, heightened security measures in place, Naval Station Norfolk said it returned to normal operations early Tuesday morning. 10 On Your Side's Michael Rinker has the story. https://www.wavy.com/news/military/naval-station-norfolk/naval-station-norfolk-puts-heightened-security-measures-in-place/...
USS North Dakota Attack Sub Rejoins Navy Fleet After Major Three-Year Overhaul At Maine Shipyard
1+ week, 4+ day ago (183+ words) The U.S. Navy has returned a Virginia-class attack submarine to the fleet following Portsmouth Naval Shipyard’s completion of its extended drydocking maintenance. The USS North Dakota arrived at Portsmouth Naval Shipyard in April 2023 for system upgrades and other maintenance. The project…...
Naval Station Norfolk implements heightened security measures
1+ week, 5+ day ago (136+ words) Naval Station Norfolk has implemented heightened security measures, resulting in changes to access at the installation, officials announced Monday. Some gates have been closed or are opening with reduced lanes as a precaution to ensure the safety and security of…...
Battle Ready USS North Dakota (SSN 784) Delivered Back to the Fleet
1+ week, 5+ day ago (130+ words) The Virginia-class attack submarine USS North Dakota (SSN 784) has been delivered back to the fleet battle ready, completing a historic first-ever Virginia-class Block III availability at Portsmouth Naval Shipyard, Kittery, Maine Aug. 20, 2026. North Dakota has undergone repairs, structural inspections, and…...
PNSY Returns North Dakota to the Fleet
1+ week, 5+ day ago (179+ words) USS North Dakota (SSN 784) successfully completed its Extended Drydocking Selected Restricted Availability at Portsmouth Naval Shipyard Aug. 29, returning the battle-ready asset to the fleet ahead of the rebaselined schedule. This commitment ensured that the complex technical upgrades were completed to…...
U.S. Navy Moves Attack Submarine USS North Carolina Closer to Indo-Pacific Return After Modernization
2+ week, 11+ hour ago (452+ words) U.S. Navy Virginia-class fast-attack submarine USS North Carolina (SSN 777) transits Pearl Harbor on August 12, 2026, after completing its undocking, moving the nuclear-powered submarine closer to renewed operational availability for Indo-Pacific missions including anti-submarine warfare, Tomahawk strike, ISR, and special operations support. (Picture…...
Teamwork Leads Norfolk Naval Shipyard to Early Completion of USS John Warner Hot Operations
2+ week, 3+ day ago (373+ words) Norfolk Naval Shipyard’s (NNSY) USS John Warner (SSN-785) hot operations test program recently completed two-and-a-half weeks early due to the combined efforts of the Nuclear Engineering and Planning Department’s Nuclear Test Engineering Division (Code 2340) and the Engineering and Planning Department’s…...